Brass Wire Mesh

Coraopolis Bridge
The Sixth Street bridges
Note: Material from this section is adopted from the HAER report on this bridge.
The through truss spans incorporated in the present Coraopolis Bridge were originally erected across the Allegheny River at Sixth Street in Pittsburgh, linking Pittsburgh with the main business thoroughfare of neighboring Allegheny City. This was the third of four bridges to serve that location, which is considered among Pittsburgh’s most important river crossings. The growth of Pittsburgh was strongly influenced by its numerous waterways, and the successful linking of the city with its neighboring communities by means of bridges was a significant factor in the development of its metropolitan identity. Allegheny City was annexed by Pittsburgh in 1907, becoming the city’s “North Side”.
First Sixth Street Bridge
The first bridge to cross the Allegheny at Sixth Street was a six-span, flat-roofed, covered wooden bridge constructed in 1819. This bridge had a total length of 1,037 feet, consisting of four 185 foot spans, a 170 foot span, and a 137 foot span. The design and construction of this bridge have traditionally been attributed to a Mr. Lothrop; it was presumably a Burr arch truss, like the Ninth (Hand) Street Bridge, another of Lothrop’s products. Physical evidence for this assumption survived until the 1890s, when an observer reported that the skewbacks from the wooden arches remained visible in the north abutment.
Second Sixth Street Bridge
In 1860 a wire-suspension bridge, designed by John A. Roebling, replaced the decaying timber structure. This bridge was four spans long, with two 344-foot main spans, and approach spans measuring 177 and 171 feet each. The bridge was dominated by cast iron towers, each formed by four cast iron columns.
Although the Roebling bridge, with its iron superstructure, was generally believed non-flammable, it fell victim to fire on June 19, 1881. The bridge was not destroyed, but its floor system of white pine and white oak was severely damaged. John Harper, president of the Allegheny Bridge Company, which owned and operated the structure, stated that he believed the fire was the result of “sparks and perhaps flame from the stacks” of passing steamboats igniting bird nests located under the superstructure of the bridge. After heavy electric streetcars were introduced to the bridge in 1890, concern over its functional capacity grew, and in 1891 plans were begun to replace the suspension bridge with one that could better handle the steadily increasing traffic, as well as permit trolleys to cross without reducing their speed.
Third Sixth Street Bridge
Coraopolis Bridge, from below deck, showing deck girders, eyebar tension members, lattice girders of truss superstructure
The third Sixth Street Bridge was designed by the nationally-significant engineer Theodore Cooper (1839-1919). This bridge has been identified as the last surviving structure entirely designed by Cooper, whose involvement extended even to such details as the bridge’s handrail, lamps, and fascia.
The third Sixth Street Bridge, like most roadway river bridges in the 19th century, was privately built and operated as a toll crossing. The total cost of construction was $560,000. This cost was underwritten by the Sixth Street Bridge Company and Fidelity Title and Trust Company, successors to the Allegheny Bridge Company, which had received its charter in 1810. When the bridge was opened in 1893, the toll was set at two cents for each man, while women crossed at no charge. Beginning in the late 1890s, Allegheny County and the City of Pittsburgh undertook a systematic program of acquiring the privately owned bridges within their jurisdiction and eliminating their tolls. The Sixth Street Bridge was purchased by Allegheny County in 1911 along with nine other bridges at the combined price of $2,851,000; all ten of these bridges were subsequently declared free.
The trusses for the third Sixth Street Bridge were fabricated by the Union Bridge Company. This company had been formed in 1884 by the merging of the Central Bridge Company of Buffalo, New York, and Kellogg and Maurice of Athens, Pennsylvania. The Buffalo plant was closed around 1890, so presumably the trusses were produced in the shops which remained at Athens.
Coraopolis Bridge with newer pony truss at left, from SE (Coraopolis side)
The superstructure was erected by the Baird Brothers, John and William, who first advertised in the Pittsburgh and Allegheny City Directory in 1886 as contractors located at Home and Valley Streets. In the 1891 and 1892 editions of the Directory they were listed as bridge builders; their listings no longer appeared by 1900, and by 1911 William Baird had left the construction business and had begun managing a hotel.
The Baird Brothers had been involved with numerous bridge projects and companies in the late nineteenth century. William Baird had worked on seven bridges crossing the Missouri River, the Merchants Bridge across the Mississippi River at St. Louis, two bridges crossing the Ohio River at Wheeling, West Virginia, the bridge carrying the Baltimore & Ohio Railroad across the Susquehanna River, and bridges at Steubenville, Ohio, and Poughkeepsie, New York. John Baird had also been involved in the construction of the Eads Bridge in St. Louis and the Cairo bridge in Memphis, and had been employed by the McCann Construction Company, the Keystone Bridge Company and American Bridge Company.
This bridge was also outgrown.
While the Pittsburgh City Council and the Municipal Affairs Committee of the Chamber of Commerce argued for the retention and upgrading of the existing bridges, the issue was ultimately decided by the Department of War, acting under the authority of Section 18 of the Rivers and Harbors Act of March 3, 1890 (30 Stat., 1121-1153). This act empowered the Secretary of War to require the removal or alteration of any bridge which ” … is an unreasonable obstruction to the free navigation . . . on account of insufficient height, width of span, or otherwise”. So, unfortunately, the War Department decreed that the numerous bridges over the Allegheny with their differing spacing of piers, main spans, and generally low clearances, were an impediment to navigation, and decreed that all bridges would have to be replaced. Although the decree was discussed in the early 1900s, and first issued in 1917, serious work did not begin till 1924. As part of the Three Sisters (Pittsburgh) project, the bridges at Sixth, Seventh, and Ninth Streets were to be demolished and replaced. The other two bridges were destroyed and scrapped, but the Cooper Bowstring trusses were moved to Coraopolis and reused.
Moving the Sixth Street Bridge to Coraopolis
Note: The material in this section is taken from a different HAER report.
The 1892 Sixth Street Bridge (as described above, a pair of camelback Pratt trusses and the third bridge built in this location) had a second chance. In 1927, it was lowered from its piers, the top chords partially disassembled. The structure was floated downriver to a new location over the Ohio River back channel between Coraopolis and Neville Island to make way for the current Sixth Street Bridge structure.
A forced opportunity
The Cooper spans remained in good shape, and concerns for economizing in public works projects led to recycling of the 1892 bridge. Commissioner Armstrong took credit for proposing to reuse the Cooper bridge instead of building an entirely new structure in nearby Coraopolis, saving Allegheny County $350,000. The Foundation Company bid on a contract to move the Sixth Street Bridge from its site in downtown Pittsburgh to Coraopolis, twelve miles away. Winning the contract at a bid of $316,200, the company also assumed any risk that the spans would sink or be damaged during the project. The company allowed pedestrians to cross the structure while roadway removal proceeded in the fall of 1926 in order to reduce the inconvenience for residents. Workers took off half of the roadway at a time, leaving pedestrian areas accessible until final segments were taken away
Coraopolis Bridge with newer pony trusses in background, filigree work and decorative mesh of arched openings in foreground. Built up compression girder members at side, and tierod bracing also visible at top of arch
Removal process
The bowstring trusses, in addition to weighing 1,600 tons each, presented the difficult problem of being slightly too tall to fit under two bridges along the journey. Because of the stresses inherent in a bowstring truss, the Foundation Company could not merely disassemble them; instead, the firm had to transport the entire 450′-0″ spans, which were 44′-0″ wide and 80′-0″ high.
Each truss consisted of sixteen eye-bar panels pinned together. Removing one part would break the structure’s rigidity and make moving it very difficult. Instead of shifting the spans off piers for lowering or pivoting them from their present support, the Foundation Company lowered the structure in position, taking off the masonry and using substitute supports for resting the structure without getting in the way of the process. The contractor attached a frame to each of the piers and abutments, used straps to bind the trusses to each frame, and lowered them using the straps.
With twenty-six 7″ holes punched in the strap, the company used a matching chain to counter the eight straps. Using pins to move the strap by hole sets, the company brought the spans downward 15″ at a time with jacks. The pins attached to the plungers of eight 500-ton jacks. The jacks remained in place while the pins moved 15″. The water-cylinder jacks were also 15″ high, capable of exerting 3200 psi after pumping. By bleeding water out of the cylinders of the jacks all at once, workers used the four jacks on each side of the bridge to lower the spans on alternate sides to the full depth of 16-0.
Transport
Workers made a pontoon out of two pairs of barges, spaced to create a platform 400′-0″ long and 52′-0″ wide, which carried the bridge with 20′-0″ of overhang. Stringers supported the bridge in forty-two places, with a 40-ton screw jack at each stringer for easier loading and unloading. When workers reached the Manchester Bridge, they had to adjust the bridge to fit the clearance, which was 14′-0″ and 12′-0″ less than the bridge height. After supporting the bridge under the floor beams, they disassembled the top chord and stabilized each panel point on the trusses. Steering the bridge under the Manchester Bridge and the railroad bridge at Brunot’s Island, the tugboat captains went through the Ohio River lock and up the back channel toward Coraopolis, where piers and abutments had been constructed.
Reassembly
Reversing the process and using the same jacks and steel frames to raise the structure 32′-O”, the company erected the Cooper bridge 30 days after the project began.
The Farris Engineering Company, a Pittsburgh company located in the Empire Building, performed a great deal of work on the bridge at its new location. The original approved contract for their work had a price total of $271,811.50. They built portions of the substructure that the Foundation Company had not done. Farris also erected the two pony truss approach spans, repaired and painted the main superstructure, and paved the bridge deck and the two approaches.
The approach spans, and the end bearings for the main spans, were fabricated by the American Bridge Company at its shops located in Ambridge, Pennsylvania.
End of life
Allegheny County ended up replacing the Coraopolis Bridge with a new bridge at this location. By the 1980s, due to its deteriorated condition and inadequate load carrying capacity, the four span truss bridge did not meet the transportation needs of its location.
After nearly 50 years of additional service, which included weight restrictions and closings during cold weather (for a time it was restricted to carrying vehicles with a maximum weight of three tons, and it was only open to vehicular traffic during periods when the temperature is above 30 degrees Fahrenheit), the old bridge was replaced by a unremarkable deck girder bridge which was completed in 1995.
Thus, eventually it was closed, replaced, and demolished, ending a unique chapter in American bridge history.
Notes
^ The town Coraopolis (and therefore the bridge) are sometimes referred to as Corapolis, that is, missing the ‘O’ between the ‘A’ and ‘P’, which can make searches somewhat difficult. For example the HAER material is indexed this way although the HAER article text uses the spelling with the ‘O’.
^ The trusses are conflictingly referred to in different sources as “Bowstring”, “Pennsylvania” or “Pratt”. Pratt is the most common name. Bowstring may refer to the shape of the bridge, it has some resemblance to a bow, with the roadway as the string (in this particular truss design instance, the members at the road level are eyebar, as can be seen in the belowdeck illustration, above, and thus are in tension only, which also may be why it’s named that way) This tension only, pin joint construction is the major factor making the move difficult.
^ The HAER (Historic American Engineering Record) report gives an extensive history of the various bridges at the 6th street site, and of this bridge once moved. It is available in .tif form at external link #4, but Bruce S. Cridlebaugh of pghbridges.com has already scanned the text in. This text is available at external link #5.
^ The HAER (Historic American Engineering Record) report gives an extensive history of the various bridges at the 6th, 7th and 9th street sites, and some info on this bridge once moved. It is available in .tif form at external link #6, but Bruce S. Cridlebaugh of pghbridges.com has already scanned the text in. This text is available at external link #7.
^ This image shows the removal and barge loading process. This image (both from the pghbridges.com site) shows a truss loaded on the barge and being moved. The top chord has been disassembled to allow clearance of some bridges it must pass under.
External links
Coraopolis Bridge at Structurae
Historic American Engineering Record (HAER) No. PA-217, “Coraopolis Bridge”
Image at HAER.
report HAER “Corapolis Bridge, Spanning Ohio River back channel at Ferree Street & Grand Avenue, Corapolis, Allegheny County, PA” 21 pages
Text of 21 page HAER writeup at pghbridges.com (this text is in the public domain since it is taken from the Library of Congress HAER report).
report HAER “Three Sisters Bridges, Spanning Allegheny River at Sixth, Seventh & Ninth Streets, Pittsburgh, Allegheny County, PA” 43 pages.
Textof 43 page HAER writeup at pghbridges.com (this text is in the public domain since it is taken from the Library of Congress HAER report).
article at pghbridges.com
Google Maps Composite image zoomed in, showing replacement bridge.
Categories: Bridges completed in 1892 | Bridges completed in 1927 | Bridges in Pennsylvania | Truss bridges | Bridges on the National Register of Historic Places | National Register of Historic Places in Pennsylvania | Tied arch bridges | Bridges over the Ohio River
About the Author
I am China Manufacturers writer, reports some information about brass paper towel holder , bath towel cabinet.
Dr. Airsoft, Practical Testing: Brass Guard (Praetorian, BAT, Stalker)
|
|
Amaco Wireform Mesh – 16 x 20, WireMesh, Brass, Single Sheet, Woven This woven 80 mesh looks and feels like fabric, but will hold its shape. Cuts easily with scissors and can be used to create a variety of art and craft projects. Available in both copper and brass…. |
|
|
AMACO WireMesh #80, 16-Inch by 20-Inch Sheet, Brass $17.95 Wire mesh Woven Wire Fabric. 80 mesh in brass. This tightly woven 80 mesh wire looks and feels like fabric! But because it is wire it will hold its shape after you crimp fold or bend it. WireMesh can be used to create beautiful fine art objects floral designs jewelry and home decor accents. It cuts easily with scissors and can be embellished with polymer clay stones and beads…. |
|
|
Wire Mesh Ribbon 6mm Brass 30 Inches $4.49 … |
|
|
Decorative Wire Mesh Satin Brass 36 x 48 $199.99 Decorative wire grilles are a simple way to dress up many projects from kitchens to fine furniture. Use with or without glass on items such as entertainment centers, wine cabinets, kitchen cabinets, bookcases and much more…. |
|
|
Wire Grille Brass Plated 36 x 48 $199.99 Decorative brass plated wire grilles are a simple way to dress up many projects from kitchens to fine furniture. Use with or without glass on items such as entertainment centers, wine cabinets, kitchen cabinets, bookcases and much more…. |
|
|
Decorative Wire Mesh Antique Brass $199.99 Decorative wire grilles are a simple way to dress up many projects from kitchens to fine furniture. Use with or without glass on items such as entertainment centers, wine cabinets, kitchen cabinets, bookcases and much more…. |
|
|
Coleman Luminos Lantern If convenience is the name of the game, the Coleman Luminos Lantern is an odds-on favorite. While it’s a little bulky for ultra-light backcountry heads, the Luminos has some neat tricks up its sleeve, like a folding dimmer toggle, oversized ignition button, and a refillable fuel tank that eliminates the need for a second stove canister. The Luminos uses Coleman’s slip-on mantles so there are liter… |
|
|
Coleman F1 Lite Lantern One Color, One Size The Coleman F1 Lite Lantern throws off a healthy glow, and weighs just 3.2oz detached from its fuel supply. It’s a classic little propane lamp that’s perfect for your Alaskan cabin, campsite, or back porch. The F1 Lite is refreshingly simple, with just a mesh mantle guard, wire fuel toggle, and connecting valve making up the entire lantern. Snap it onto a fuel canister, light it up, and illuminate… |
|
|
Coleman Luminos LED Lantern $82.81 Versatile and compact, the Coleman Luminos LED lantern is a great choice for both car campers and hikers. For starters, the Luminos lantern includes a refillable fuel tank, which means you can keep the fuel canister free for cooking rather than tie it up with the light. What’s more, the lantern–which works with Powermax, Campingaz, and Coleman butane/propane fuel–also includes a removable LED fl… |
|
|
Designer’s Mesh $63.99 This 1/18" (1.4 mm) mesh brass wire, woven to be highly expandable and pliable, is best for shaping, draping, and mixed media assemblage. |
|
|
dorm@edu Wire Mesh Waste Basket $6.49 dorm@edu Wire Mesh Waste Basket |
|
|
Round Wire Mesh Skimmer – 9” $3.62 Round Wire Mesh Skimmer – 9” |
|
|
Wire Mesh Mothers $3.98 Wire Mesh Mothers by Elizabeth Massie Published in 2001 by Leisure Books |
|
|
Brass Wire Disc Brushes $3.02 Brass Wire Disc Brushes |
|
|
Mesh Basket Feeder $28.41 Brass mesh feeder Brass finish, squirrel-proof mesh feeder accomodates 10 to 15 birds at once Large feeding area attracts both clinging and perching birds Holds over 2.5 lb. of black oil sunflower seeds Not suitable for wild bird seed No cleaning needed but it is dishwasher safe Wire mesh design helps protect birds from avian diseases Collapses flat for easy storage Easy-to-fill Extended roof for extra protection from weather Brand #: Sweet Corn Products B00302 UPC: 633686003029 Keywords: sunflower feeder mesh basket bird squirrel proof |
|
|
Expressions Wire Mesh Magazine File $13.65 Expressions Wire Mesh Magazine File3w x 10d x 12-1/2h.Black |
|
|
UNIVERSAL UNIVERSAL T-Rex Mesh Wire Mesh Sheet 54008 $207.29 UNIVERSAL UNIVERSAL T-Rex Mesh Wire Mesh Sheet 54008 |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts [06-07 Charger] $435.52 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts |
|
|
Chisel Stainless Steel Wire Mesh Cuff Bracelet $36.99 Chisel Stainless Steel Wire Mesh Cuff Bracelet |
|
|
45 gallon wire mesh street trash can $167.74 45 gallon wire mesh street trash can |
|
|
FAST TRAC WIRE SHEAR FOR MESH TRAY $257.99 FAST TRAC WIRE SHEAR FOR MESH TRAY |
|
|
Stainless Steel Wire Mesh Cuff Bracelet $39.98 Stainless Steel Wire Mesh Cuff Bracelet |
|
|
Prevue WIRE MESH WHEEL 6in HAMSTER $11.38 .Prevue WIRE MESH WHEEL 6in HAMSTER |
|
|
Prevue WIRE MESH WHEEL 11in FERRET $14.38 Prevue WIRE MESH WHEEL 11in FERRET |
|
|
Prevue WIRE MESH WHEEL 8in HAM/GERB $11.94 .Prevue WIRE MESH WHEEL 8in HAM/GERB |
|
|
Triangle Mesh Wire, Reinforced Concrete Pavements and Roadways $20 Triangle Mesh Wire, Reinforced Concrete Pavements and Roadways |
|
|
Wire Mesh Pallets (WMP-4048) $82.9 Non-porous material will not support bacteria growth. More cost-effective than wood or plastic pallets, galvanized wire mesh pallets offer superior moisture resistance and long life. Heavy-duty 2-gauge, 2×4″ wire mesh surface is supported by 13-gauge stringers. 3″ underside height. Nestable. Four-way fork entry. |
|
|
Twisted Wire Brass Napkin Rings $2.99 Twisted wire brass napkin rings. Available in brass. |
|
|
T-Rex 54009 Wire Mesh $207.27 T-Rex 54009 54009 Wire Mesh; 12 in. x 40 in.; Polished Stainless Steel; 3 Squares Per Inch; |
|
|
Trulock Platers Brass Wire Wheels $81.78 Trulock Platers Brass Wire Wheels |
|
|
Expressions Wire Mesh Pencil Holder $4.01 Expressions Wire Mesh Pencil Holders Mesh design adds style, efficiency and productivity to your desktopStacks on top of Paper Clip Holder (ELD22241 Series), sold separately. 3-3/4 diameter x 4-1/8h.Black |
|
|
1928 Brass W/Olivine Wire Earrings $16 Brass with Olivine wire earrings. |
|
|
Wide Wire Mesh Gate $42.86 29-50 wood safety gate Extra tall 32? high gate Fits openings 29.5? to 50? Pressure mounts instantly and securely without hardware Simply position and lock into place Sturdy hardwood frame with rigid vinyl-coated wire mesh panels and no-mar rubber bumpers Full color packaging Brand #: North State Industries 4615 UPC: 026107046154 Keywords: gate safety wood |
|
|
Wire Mesh Desk Organizer $13.11 Get your desk tidy and make supplies easy to find. Versatile wire mesh organizer features two compartments for pens and pencils, two side compartments hold pads. Space for 3 x 3 note pad (sold separately). Global Product Type: Desktop Supplies Organizers; Desktop Supplies Organizer Type: Pen/Pencil Cup Plus Storage; Number of Compartments: 4; Number of Drawers: N/A. |
|
|
Wire Mesh Flower Patio Lights $24.77 Wire mesh patio lights Each light set includes a 12′ string of 10 lights with 10 wire mesh flower lights Each set comes with 5 extra light bulbs, including 1 that makes the set blink End to end connectors for up to 3 sets UL listed Brand #: Heritage Farms 836681 UPC: 736757066814 Keywords: light set 5 extra bulbs patio lights wire flower mesh 12ft strand |
|
|
Putco 999012 Wire Mesh Side Vents $20.69 Putco 999012 999012 Wire Mesh Side Vents; Universal; Contoured; |
|
|
Putco 999013 Wire Mesh Side Vents $7.79 Putco 999013 999013 Wire Mesh Side Vents; Universal; Rectangular; |
|
|
Precision Grilles 52232199 Sixty Stainless Wire Mesh $223.34 Precision Grilles 52232199 52232199 Sixty Stainless Wire Mesh; Bumper Grille; Chrome w/Bright Trim; 0.60 in. Gauge Stainless Wire Mesh; |
|
|
Precision Grilles 52126799 Sixty Stainless Wire Mesh $212 Precision Grilles 52126799 52126799 Sixty Stainless Wire Mesh; Bumper Grille; Chrome; 0.60 in. Gauge Stainless Wire Mesh; 2 pc.; |
|
|
Black Mesh Wire Basket $5.99 Neatly arrange and organize fresh citrus fruits and bananas with the multipurpose Wire Caddy by Spectrum. This metal wire basket easily accommodates around half dozen apples, sweet limes, or even oranges. This kitchen accessory serves as the perfect fruit holder for storing fruits either in your home or even office. You can even use this metal wire basket to store supply items frequently used in kitchen, office, or your bathroom. Its dense wire construction with a black finish adds a glamorous touch to the décor of any room. This fruit holder is easy to clean, and allows you to view the contents inside.Also check out our Long Wire Caddy!Features: • Metal wire body provides durability and good looks • Black finish • Easy to clean, and allows you to view contents insideSize: 1 3/4″tall x 8 1/2″wide x 6 1/2″deep |
|
|
Brass Wire Spool $2.62 Popular for jewelry, brass wire is also effective as a complementary wire in other pieces including sculpture. It burnishes like gold. |
|
|
PRECISION – Wire Mesh Grille $279 # PG-52808598 – Hummer H3 2006 & UP, PRECISION – Stainless One-Twenty Wire Upper Mesh. Install time – 1 hour. In an industry where the only products used to dress out a vehicle, are the hottest new products, the billet grilles 14 year appeal stands out as a timeless upgrade. For over 11 years, the Precision Billet Grille line has established itself as one of the finest grille lines available. Catering to the look that custom vehicle builders have demanded over the years, whether you are looking for a current model or a 15 year old classic truck, chances are Precision makes a grille for you. Each application is made of the finest materials and crafted to enhance the vehicle with precision fitting products. Detailed installation instructions included along with all necessary mounting hardware. |
|
|
2.5mm Italian Brass Grey Mesh Necklace $69.95 2.5mm Italian Brass Grey Mesh Necklace |
|
|
2.5mm Italian Brass White Mesh Necklace $69.95 2.5mm Italian Brass White Mesh Necklace |
|
|
Whiting and Davis Relaxed Brass Mesh Mini Hobo $150 Whiting and Davis Relaxed Brass Mesh Mini Hobo |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) [07- Avalanche] $471.78 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) [07- Suburban 1500] $471.78 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) [07- Tahoe] $471.78 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (S Style) |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts [06- Silverado 1500;;05-06 Silverado 2500 / 3500 HD] $435.52 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (Horizontal) [05-07 300 / 300C] $435.52 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (Horizontal) |
|
|
TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (Bumper) [06-07 Charger] $298.94 TFP Grille Mesh – Chrome Wire Mesh Grill Inserts (Bumper) |
|
|
Wire/Mesh Cushion Black $29 An icon of Mid-Century modern, the Wire comes in three finishes, chrome, matte black, or matte white, as well as in two heights: dining and bar. It is made of a welded solid steel frame with six cushion color options: black, white, red, green, gray, and espresso. |
|
|
Wire/Mesh Cushion White $29 An icon of Mid-Century modern, the Wire comes in three finishes, chrome, matte black, or matte white, as well as in two heights: dining and bar. It is made of a welded solid steel frame with six cushion color options: black, white, red, green, gray, and espresso. |
|
|
Wire/Mesh Cushion Red $29 An icon of Mid-Century modern, the Wire comes in three finishes, chrome, matte black, or matte white, as well as in two heights: dining and bar. It is made of a welded solid steel frame with six cushion color options: black, white, red, green, gray, and espresso. |